Street resurfacing

To extend the life of a street, we replace the top layer of asphalt pavement. This will extend the life of a street between larger reconstructions. Pedestrian ramps are also replaced to meet current ADA standards.

Key information

Dates

2024 and annually

Location

Citywide

Program overview

In this ongoing street maintenance program, we replace the top layer of asphalt pavement to extend the life of a street between larger reconstructions. The new pavement should last about 10 years.

Traffic impacts

For safety, roadways are generally closed to through traffic during resurfacing work. Some busier streets may remain partly open to help with traffic flow. We do our best to finish projects quickly.

More about resurfacing

How long does resurfacing take?

More about pedestrian ramps

Why is the City replacing the pedestrian ramp?

To meet current ADA standards, pedestrian ramps need updating or replacement.  The City of Minneapolis covers the cost of the ADA pedestrian ramp upgrades.

 

View interactive map

Project phase

This project is ongoing.

Input

Design

In Progress

Complete

Evergreen Dr resurfacing results from 2019
Evergreen Dr resurfacing results from 2019

Contact us

Hazel Wolf

Supervisor Engineering Technician
Public Works

Phone

612-772-2524