Hennepin Dunwoody Bikeway and Multi-Use Trail

The City will add trails and bicycle lanes along Hennepin Avenue and Dunwoody Blvd. The City will improve crosswalks and sidewalks.

Key information

Dates

2022 to 2025

Location

The project is located on Dunwoody Boulevard and Hennepin Avenue. It is between Linden Avenue and N 12th Street. It passes through the Lyndale Avenue intersection.

Loring Park Lowry Hill

Project overview

The City will put in a multi-use trail and off-street bicycle lanes along Hennepin Avenue and Dunwoody Blvd. 
 
The project will also pass through the Lyndale Avenue intersection.
 
This new street design will meet current and future needs and aligns with City policies:

Project goals

Project goals

  • Build a two-way, multi-use trail on Dunwoody Boulevard and Hennepin Avenue. The trail will run from Linden Avenue to the west of 17th Street. The trail will be above the street grade. It will also protect users from vehicle traffic by a concrete barrier.
  • Build one-way curb protected bicycle lanes on Hennepin Avenue between 17th to 12th Street. The lanes will replace existing painted on-street lanes and raise the lanes to the level of the sidewalk at intersections.
  • Make crossing improvements for pedestrian traffic along the whole street.
  • Slow turning motor vehicle traffic.

Project updates

The Hennepin-Dunwoody Bikeway project opened for traffic on Friday, November 22, 2024 as part of the 2024 construction work.

Looking ahead in 2025

  • Replace temporary signals with permanent signal systems.
  • Planting/landscaping
  • Install Bikeway median from 16th St to 12th St.

Signal work may begin in January but otherwise it is anticipated that no other work will be done between November 21, 2024 to late April 2025.

 

Project engagement

Engagement and Design in 2022 and 2023. Construction will occur in 2024 and 2025.

Two open house workshops were held in December 2022 and June 2023.

Weekly stakeholder meeting

This concludes the weekly stakeholder meetings for the 2024 phase of the Hennepin Dunwoody bike trail.

Thank you for your patience and support throughout the project. The weekly stakeholder meetings will resume in spring 2025.

Project phase

This project is in progress.

Input

Design

In Progress

Complete