Green Central Safe Routes to School
Dates
2021-2024
Location
E 34th St (Clinton Ave – 10th Ave), 10th Ave S (E 34th St – E 28th St), and 11th Ave S (E 34th St – E 28th St) Central Midtown Phillips Powderhorn ParkProject overview
Project details
The Green Central Safe Routes to School (SRTS) project will update 1.3 miles of walking and bicycle paths on East 34th Street and 10th/11th Avenues South.
The updates will help people of all ages and abilities.
This project will build a safe connection to Green Central Elementary School, other bikeways, parks, and important destinations in the area.
Project updates
2024 Construction
This SRTS construction began in mid-July, 2024.
What is happening
- Stage 1 – Improvement E 34th St began July 16.
- Stage 2 – Improvement 10th Ave S began August 19.
- Sign installation is complete.
- Concrete median cut-through is complete at Park intersection.
- Bioretention basins are complete.
- Pavement markings are complete along E 34th St and 10th Ave S.
- Traffic signal systems are in progress, and pedestrian push buttons will be installed.
- Temporary asphalt bike lane is installed through 10th Ave S and E Lake St.
- Temporary hydro much stabilization is in boulevard areas.
- Improvements are complete along E 34th St and 10th Ave S, except the cul-de-sac near E Lake St.
What to expect in Spring 2025
- Permanent concrete bike lane will be installed at the cul-de-sac near E Lake St.
- Seeding and sodding will be done in boulevard areas and at biofiltration basins.
- Green Central SRTS will be all complete with these final items in 2025.
Bi-weekly stakeholder meeting
There will be no more Bi-weekly stakeholder meetings in 2024 for Green Central SRTS.
Thank you for your patience and support throughout the project!
Safe Routes to School projects
Project background
2024 Capital Project
The proposed concept layout for E 34th Street and 10th Avenue S are now available. Public Works will present the project to the Public Works and Infrastructure (PWI) Committee. The PWI Committee is apart of the Minneapolis City Council who will review it. The Public Works team will seek approval for the proposed layout on Thursday, June 8th, 2023, at 1:30 PM.
See the proposed concept layout
Note: This layout may take additional time to load due to large file size.
2023 Demonstration project
A demonstration project was installed along East 34th Street from Clinton Avenue to Park Avenue. The project aims to try out changes using temporary materials. This will help plan for the permanent improvements in the 2024 Green Central Safe Routes to School project. The project will make walking and bicycling to school easier, safer, and more enjoyable for students. This demonstration project features:
- Crossing enhancements, including marked crosswalks at Clinton Ave @ E 34th St.
- Curb extensions at Clinton Ave @ E 34th St to help narrow the crossing distance for children walking to school.
- An in-street bollard protected two-way bikeway from Clinton Ave to Park Ave along the south side of E 34th St.
- There will still be access to all driveways and alleys on E 34th St.
- The demonstration project was installed on April 27, 2023. The project will remain in place until construction begins for permanent improvements in the Spring of 2024.
Survey
See the 2023 Demonstration project summary & survey result summary
Past project meetings
Green Central SRTS Pre-construction stakeholder meeting - July 11, 2024
- A virtual pre-construction meeting was held to provide an overview of project construction work and answer project questions.
Provide feedback on the corridors
Project resources
Project information
We provide information about the Green Central SRTS project.
Green Central SRTS project info
Mpls Green Central SRTS demo sign before - Spanish
Mpls Green Central SRTS demo sign before
Mpls Green Central SRTS demo project summary
Complete streets checklist
We use a checklist to review details for the Green Central Complete Streets.
Project phase
This project is in the in progress phase.
Input
Design
In Progress
Complete
Sign up for project updates
Sign up to get alerts about this project. You'll need to provide your email address.